Strong’s
H2099Proper name, a title2 times in the Hebrew BibleWhere it occurs
Translated as
In the text
- 1 Kings 6:1זִו
In the four hundred and eightieth year after the Israelites had come out of the land of Egypt, in the fourth year of Solomon’s reign over Israel, in the month of Ziv, the second month, he began to build the house of the LORD.
Brown-Driver-Briggs
זִו appar. n.pr. of 2nd month, = c. April-May, named as month of beginning the temple-building
Sources: Brown-Driver-Briggs (1906, public domain) from the Open Scriptures Hebrew Lexicon (CC BY 4.0), glosses from STEPBible TBESH (CC BY 4.0); STEPBible TAHOT (Hebrew Bible, Leningrad Codex, CC BY 4.0); the Berean Standard Bible (public domain). Reformatted by Word Study, wording unchanged. All sources and licenses.